RFQ vs BOQ: What Each One Is
An RFQ (request for quotation) is the message or document asking suppliers to price your requirement. It sets out what you need, by when, where it must be delivered, how quotations should be submitted and by what deadline.
A BOQ (bill of quantities) is the itemised list inside or attached to the RFQ: each line describes one item with its specification, unit and quantity. In construction, BOQs are prepared by quantity surveyors; for office and facility purchases, a simpler BOQ in Excel works perfectly.
Step 1: Describe Each Item by Specification
| Vague line | Priceable line |
|---|---|
| Paper | A4 copy paper, 80 GSM, white, 500 sheets/ream — 100 reams |
| Chairs | Ergonomic mesh task chair, adjustable height and arms, lumbar support, nylon base — 20 pcs |
| Gloves | Nitrile disposable gloves, powder-free, size M, box of 100 — 50 boxes |
| Cable | 4-core 16 mm² copper armoured cable — 120 m |
| AC | 1.5-ton DC inverter split air conditioner, wall-mounted — 6 units |
A useful test: if two different suppliers read your line, would they price the same product? If not, add detail — size, grade, material, capacity, model or standard.
Step 2: Use Consistent Units and Quantities
Write the unit explicitly — pieces, boxes, reams, cartons, metres, sets, litres — and keep it consistent. "10 boxes (100 pcs each)" leaves no doubt; "1,000 gloves" might be priced per box or per piece by different suppliers, making comparison harder.
Step 3: State Brand Preference Clearly
For each line choose one of three positions and write it down:
- Fixed brand — only the named brand or model is acceptable.
- Brand or equivalent — named brand preferred, equivalents acceptable if declared.
- Supplier to propose — ask for options, sometimes economy and premium side by side.
Without this, one supplier will quote premium brands and another economy brands, and the totals will be impossible to compare fairly.
Step 4: Add Delivery, Timing and Documentation
Include the delivery address in Lahore (or several addresses for branches), access restrictions, the required-by date, and any documents you need — quotation on letterhead, PO reference on invoices, branch-wise delivery challans. Mention if installation is required so it is quoted separately.
Step 5: Set Submission Rules
Tell suppliers how to submit (email, sealed envelope, portal), the deadline, the validity period you expect and whether partial quotations are accepted. Ask them to keep your line order and numbering so their quotations drop straight into your comparative statement.
A Simple BOQ Layout
| S.No | Item | Specification | Brand preference | Unit | Qty | Delivery location | Required by |
|---|---|---|---|---|---|---|---|
| 1 | Copy paper | A4, 80 GSM, white | Brand or equivalent | Ream | 100 | Head office, Gulberg | 1 Dec |
| 2 | Safety helmet | HDPE, ratchet harness, white | Supplier to propose | Pc | 40 | Factory, Sundar | 5 Dec |
| 3 | LED panel light | 2×2, 40W, 4000K | Fixed brand | Pc | 60 | New floor, DHA | 15 Dec |
Our free BOQ / RFQ Excel template uses this layout and adds supplier price columns with automatic totals, so you can compare quotations side by side.
Common Mistakes to Avoid
- Mixing several items in one line ("stationery items as per need").
- Leaving quantities as "lot" without describing what the lot contains.
- Forgetting accessories — mounting brackets, cables, consumables, installation.
- Changing specifications after quotations arrive without telling all suppliers.
- Setting a deadline too short for technical or custom items.
When you are ready, you can send your BOQ to Global Empire for an itemised quotation, or read how to choose a general order supplier.